Project: Flood Alleviation Scheme, Birstall, West Yorkshire
Product Used: Porcupine
To prevent flooding during severe rainfall, the capacity of Batley Beck had to be increased. As there was limited scope for additional landtake it was decided to steepen the side slopes using Porcupine retaining wall blocks. Not only do the walls act as retaining structures, but also prevent bank erosion and scour during peak flows.
VERDANT SOLUTIONS LTD
High Street, Hartfield, East Sussex. TN7 4AE
Tel: 01892 770470 Fax: 01892 770760
Email: office@verdantsolutions.ltd.uk